Started today by installing the brake hydroboost/master cylinder after taking the back of it apart and adding a special adapter supplied by FFR..
Then I hooked it up to the brake pedal and installed the brake light switch.
After that I spent some time riveting first the floor pans..
You can see below the rivets before the end is popped off. Basically you apply a bead of silicone under each panel where it contacts the frame or other panel, then put the panels on with a few sheet metal screws. Next you carefully measure so the rivets are spaced evenly and straight, drill the holes, and put the rivets in.
Lastly I riveted both driver and passenger foot well panels.
Still more riveting for the interior and trunk.
Thursday, May 17, 2007
Subscribe to:
Post Comments (Atom)
No comments:
Post a Comment